McRuss

Hello,

it's been quite a while since my last post. I continued on my Garve and Ullapool Railway and rebuilt my Leckmelm modules. I also laid the track at Inverlael station and build a small fiddle yard for the branchline that leaves the main line at Inverlael.

But in early spring I constructed a second level above my Garve and Ullapool Railway. There I will built a H0 american layout. loosely based on John Allens Gorre & Daphetid.

On the second level over the peninsula which houses the Fiddle yard and Inverlael, is the place for an alternate Gorre station. The rest of the layout will follow along the walls.

Here is the trackplan which I changed a bit in the meanwhile.

I lengthened the track which on the original G&D would have gone to Daphetid. I also included a small two track yard between the headshunt  and the track to Daphetid. The next alteration I made to the trackplan is, that I put a passing siding on the line to Sorethroat.

A bit of history of the Sorethroat Branch.

Around 1900 a prospector found cinnabar in the mountains near Sorethroat. The local  businessmen at Sorethroat decided to fund a railway from Sorethroat to Gorre. Here they could connect with the G&D. Within a short time the line was built. Because of the restricted space at Sorethroat the Railroad company built a turntable at the end of the station so that the turntable could be used for running arround the train.At Gorre there was no roundaround sidingat first, because the S&P got trackage rights on the G&D. But these was added a few years later. In the early years of the S&P G&D president Vanderslip decided to built a Cinnabar Smelter at Gorre.                                                                                                                                          During the 1920s the S&P got into financial trouble and was acquired by the G&D. During the Great Depression in the 1930s a massive landslide burried a large part of the line to Daphetid. Due to the lack of revenue on the line to Daphetid, the line was never rebuilt. And the Gorre was the end of the line. After the takeover of the S&P there were plans to built a wye at Gorre, but with the position of the cinnabar smelter these was not possible.

In my timesetting for my G&D we are in the years after the war. The G&D is a bit of anachronism. Because there is a lot of rolling stock and vehicles would suit an earlier period.

Here some pictures from earlier these year.




Markus

Reply 0
Michael Tondee

Nice to see the G&D still

Nice to see the G&D still being a source of inspiration.  Stll the greatest model railroad ever built IMHO.

MIchael

 

Michael, A.R.S. W4HIJ

 Model Rail, electronics experimenter and "mad scientist" for over 50 years.

Member of  "The Amigos" and staunch disciple of the "Wizard of Monterey"

My Pike: The Blackwater Island Logging&Mining Co.

Reply 0
pschmidt700

Still the greatest model

Quote:

Still the greatest model railroad ever built IMHO.

I agree. Maybe only the V&O can match the G&D's stature.

Reply 0
ray schofield

Track work

Nice to see some of us still living that remember the G & D. John was an inspiration to so many of us. I belong to a club and mentioned John Allen and very few even knew who he was.

 One question that your photos elicit, are you hand laying your track? Some of the ties look like Fast Tracks products..                           

                                                                                          Thanks for sharing

                                                                                                       Ray

Reply 0
McRuss

Re Trackwork

Hello Ray,

yes I'm hand laying most of the track. In the fiddle yard I used commercial products from Atlas and Piko (a german model railroad manufacturer) The curved track on the station entrance and on the right is code 83 flex track from Tillig (another german manufacturer), which I got to hand when I was laying the track. For the turnouts at Gorre and for the rest of the layout I use/will use Fast Tracks #5 templates and Fast Tracks turnout tie racks.

Markus

Reply 0
ray schofield

Trackwork

Thanks Markus

I bought the code 70 # 6 jig and various other tools and supplies. So far still in the learning mode, but did use it successfully to make a track that separates the dual gauge into standard and narrow gauge see attached . I have a Kadee spiker and did lay a branchline on a previous layout, but at 74 decided to use Micro Engineering track it%20rrl.JPG 

Reply 0
Reply